Boeckman Creek Flow Mitigation Site

Share Boeckman Creek Flow Mitigation Site on Facebook Share Boeckman Creek Flow Mitigation Site on Twitter Share Boeckman Creek Flow Mitigation Site on Linkedin Email Boeckman Creek Flow Mitigation Site link
Boeckman Creek Vicinity Map

The City is required by state law to remove the existing flow control structure under the proposed bridge on Boeckman Road over Boeckman Creek. Stormwater runoff has been historically directed away from its natural drainage towards Boeckman Creek. This project will redirect run-off to the natural drainage heading south from the Siemens site under I-5 and to the west. This project will improve the drainageway through grading, vegetation management, and culvert modifications where necessary.

More information will be available as the predesign and data collection is complete.

The City is required by state law to remove the existing flow control structure under the proposed bridge on Boeckman Road over Boeckman Creek. Stormwater runoff has been historically directed away from its natural drainage towards Boeckman Creek. This project will redirect run-off to the natural drainage heading south from the Siemens site under I-5 and to the west. This project will improve the drainageway through grading, vegetation management, and culvert modifications where necessary.

More information will be available as the predesign and data collection is complete.

Page published: 11 Mar 2024, 03:31 PM