Frog Pond West Park Design Project (Complete)

Share Frog Pond West Park Design Project (Complete) on Facebook Share Frog Pond West Park Design Project (Complete) on Twitter Share Frog Pond West Park Design Project (Complete) on Linkedin Email Frog Pond West Park Design Project (Complete) link

The design of the City's next great neighborhood park has been completed.

This park, which is located within Frog Pond West adjacent to the soon-to-be-built primary school on Boeckman Rd., will be about 2.9 acres in size.

The community has expressed overwhelming support for the new park, which is being funded with assistance from Metro's Local Share program. After sharing three draft designs, developed by the City with landscape architects from Portland-based Mayer/Reed, the City received feedback from nearly 150 community members. That process has informed the final design you see below.

In February/March 2023, the City shared a virtual house video, followed by a short survey that provided an opportunity for community members to share their preferences. Results were analyzed by the project team, after which architects developed a preferred design that incorporates the community's preferences.

Construction is expected to begin after the park plan is adopted by the Development Review Board and the City Council, and a successful RFP process is completed. If you have questions about the draft plan that we can answer before adoption, let us know.

Thanks to everyone who participated in the planning of this park. We look forward to delivering this great new amenity soon.

The design of the City's next great neighborhood park has been completed.

This park, which is located within Frog Pond West adjacent to the soon-to-be-built primary school on Boeckman Rd., will be about 2.9 acres in size.

The community has expressed overwhelming support for the new park, which is being funded with assistance from Metro's Local Share program. After sharing three draft designs, developed by the City with landscape architects from Portland-based Mayer/Reed, the City received feedback from nearly 150 community members. That process has informed the final design you see below.

In February/March 2023, the City shared a virtual house video, followed by a short survey that provided an opportunity for community members to share their preferences. Results were analyzed by the project team, after which architects developed a preferred design that incorporates the community's preferences.

Construction is expected to begin after the park plan is adopted by the Development Review Board and the City Council, and a successful RFP process is completed. If you have questions about the draft plan that we can answer before adoption, let us know.

Thanks to everyone who participated in the planning of this park. We look forward to delivering this great new amenity soon.

  • Esta encuesta ha concluido.

    El video virtual de puertas abiertas mostró tres diseños preliminares para un nuevo parque de 2.9 acres que se desarrollará en el vecindario de Frog Pond West. Cada diseño presentaba elementos similares (refugios, senderos, equipos de juego, gimnasio para adultos, césped abierto), pero hubo diferencias significativas en dónde se colocaron los elementos y cuánto espacio ocuparon. El video está en inglés, con subtítulos en español.

    Responda algunas preguntas para ayudarnos a comprender mejor qué características prefiere más, de modo que cuando se desarrolle el diseño final, refleje con precisión las preferencias de la comunidad. Gracias por participar.

    Take Survey
    Share Encuesta de diseño on Facebook Share Encuesta de diseño on Twitter Share Encuesta de diseño on Linkedin Email Encuesta de diseño link
Page last updated: 12 Apr 2023, 02:11 PM