Share Wastewater Treatment Plant Master Plan on FacebookShare Wastewater Treatment Plant Master Plan on TwitterShare Wastewater Treatment Plant Master Plan on LinkedinEmail Wastewater Treatment Plant Master Plan link
The City of Wilsonville is updating its Wastewater Treatment Plant Master Plan.
The improvements detailed in this Plan are designed to provide optimal value to the City’s ratepayers by maximizing the use of existing infrastructure and improving system operation while continuing to protect water quality and human health and supporting economic development, consistent with goals and policies contained in the 2018 Comprehensive Plan and 2021-2023 City Council Goals.
The City’s WWTP, located at 9275 Southwest Tauchman Rd., was originally built in 1971. A major 2014 upgrade expanded the average dry weather capacity to four million gallons per day (mgd) to accommodate population growth. The City contracts with Jacobs for daily operation of the WWTP. WWTP processes include headworks screening and grit removal facilities, aeration basins, stabilization basins, secondary clarifiers, biosolids processing, cloth filtration, and disinfection processes. Treated effluent is discharged into the Willamette River.
This Plan, which satisfies requirements established by the State of Oregon Department of Environmental Quality (DEQ), considers:
The age and condition of existing process equipment and structures
Growth to accommodate population growth and new economic development over the planning period (through 2045). Projections are based on projections, WWTP historical data and DEQ wet weather project methodologies.
Potential changes to water quality regulations established by the DEQ.
City of Wilsonville Wastewater Collection System Master Plan (2014, MSA), and
Consistency with the 2018 Comprehensive Plan and City Council 2021-2023 Goals 5, 6 and 7:
Goal 5: Align infrastructure plans with sustainable financing sources.
Goal 6: Engage the community to support emergency preparedness and resiliency.
Goal 7: Protect Wilsonville's environment and increase access to sustainable lifestyle choices.
To view the plan, see the "documents" box on this page.
The City of Wilsonville is updating its Wastewater Treatment Plant Master Plan.
The improvements detailed in this Plan are designed to provide optimal value to the City’s ratepayers by maximizing the use of existing infrastructure and improving system operation while continuing to protect water quality and human health and supporting economic development, consistent with goals and policies contained in the 2018 Comprehensive Plan and 2021-2023 City Council Goals.
The City’s WWTP, located at 9275 Southwest Tauchman Rd., was originally built in 1971. A major 2014 upgrade expanded the average dry weather capacity to four million gallons per day (mgd) to accommodate population growth. The City contracts with Jacobs for daily operation of the WWTP. WWTP processes include headworks screening and grit removal facilities, aeration basins, stabilization basins, secondary clarifiers, biosolids processing, cloth filtration, and disinfection processes. Treated effluent is discharged into the Willamette River.
This Plan, which satisfies requirements established by the State of Oregon Department of Environmental Quality (DEQ), considers:
The age and condition of existing process equipment and structures
Growth to accommodate population growth and new economic development over the planning period (through 2045). Projections are based on projections, WWTP historical data and DEQ wet weather project methodologies.
Potential changes to water quality regulations established by the DEQ.
City of Wilsonville Wastewater Collection System Master Plan (2014, MSA), and
Consistency with the 2018 Comprehensive Plan and City Council 2021-2023 Goals 5, 6 and 7:
Goal 5: Align infrastructure plans with sustainable financing sources.
Goal 6: Engage the community to support emergency preparedness and resiliency.
Goal 7: Protect Wilsonville's environment and increase access to sustainable lifestyle choices.
To view the plan, see the "documents" box on this page.
Share Sept. 28 Open House on FacebookShare Sept. 28 Open House on TwitterShare Sept. 28 Open House on LinkedinEmail Sept. 28 Open House link
The City of Wilsonville conducted a virtual public open house on Sept. 28, 2022, to present the draft Wastewater Treatment Plant Master Plan, and to respond to questions and comments from community stakeholders.
Those unable to attend may provide questions and comments under the "Comment" tab or contact Mike Nacrelli at mnacrelli@ci.wilsonville.or.us.
Wastewater Treatment Plant Master Plan has finished this stage
Review of the draft plan is underway. The City is hosting an Sept. 28 open house to detail the plan and to provide an opportunity for public review and comment.
Public Hearings
Wastewater Treatment Plant Master Plan is currently at this stage
Public input will inform the draft plan, which is scheduled for the following review before adoption:
Sept. 28, 2022:Public Open House
Oct. 11, 2023: Work Session (Planning Commission)
Nov. 6, 2023: Work Session (City Council)
Dec. 13, 2023: Public Hearing (Planning Commission)
Jan. 4, 2024: Public Hearing (City Council, first reading)
Jan. 18, 2024: Public Hearing (City Council, second reading)
Adoption
this is an upcoming stage for Wastewater Treatment Plant Master Plan